Management1A systematic setup for a quality-improvement programme includes identifying opportunities and resources, developing a project plan with key stakeholders, resources, task list, budget, and timeline, collecting baseline information on current care and barriers, generating data-collection and reporting systems, implementing behaviour-change strategies, and then evaluating and sustaining the programme with ongoing leadership, collaboration, and hospital-management support.
2Good foundations for a successful quality-improvement programme include strong motivation, teamwork, and leadership.
3Information technology and checklists are presented as tools that provide reminders, facilitate use of practice guidelines, and reduce errors.
4Standardized order sets, disease-specific pre-printed order sets, and daily order sets that include goals for care are described as facilitating implementation of best practices and improving compliance.
5Other facilitators of ICU quality-improvement work include establishing standards of care, monitoring processes and outcomes, creating multidisciplinary teams, routine data recording, and automated retrieval of information using information technology.
6Institutions with successful implementation strategies are described as having leadership support, incentives for senior leaders, physician and nursing leadership, and bedside caregiver involvement in project design and implementation.
7PDSA is identified as a commonly used QI method.
8The Model for Improvement asks 3 questions: what are we trying to accomplish, how will we know that a change is an improvement, and what change can we make that will result in improvement.
9The 4 stages of the PDSA cycle are: Plan—define objectives, study questions, and data collection; Do—implement and test the change; Study—collect data before and after the change based on agreed measures and identify what was learned; Act—plan the next cycle or full implementation.
10QI models may use interventions ranging from checklists and care bundles to procedures and clinical pathways, and common themes include building a culture of quality, prioritizing opportunities, identifying barriers, collecting and analyzing data, communicating results, committing to ongoing evaluation, and sharing successes.
11Continuous quality improvement is described as using group decision-making methods and statistical tools to drive continuous improvement.
12One example given for quality control is regular inspection of the last 25 ICU discharges for readmissions, with follow-up intervention if poor practice such as inappropriate discharges is identified.
13Change management in ICU is described as often involving introduction of a new service or technology or response to increased capacity, and active change can be framed as 3 steps: unfreeze, transition, and re-freeze, while anticipating readiness and resistance.
143 elements are necessary for successful improvement: will to change, ideas to effect change, and execution using tools and techniques plus staff capability and capacity.
15For any behaviour change to occur under the COM-B model, a person must have capability, opportunity, and motivation.
16Behaviour-change techniques described include goal setting and action planning using a defined “how good by when” goal, and audit and feedback directed to the people whose behaviour is expected to change.
17Measurement for improvement should use only enough data to learn and complete another cycle, often over short periods of weeks or months, whereas accountability uses large amounts of ongoing data and research gathers as much data as possible “just in case” over longer periods.
18Before collecting data, the reason for collecting it should be explicit because this determines the type and quantity of data needed; the 3 stated reasons are research, accountability, and quality improvement.
19Timely feedback is emphasized because it increases the chance that the clinicians receiving the data were responsible for the measured behaviour, and data sharing at multiprofessional meetings is described as useful for changing practice.
20Peer comparison and identifying outliers are described as useful enablers to facilitate change.
21One benchmark approach for feedback is “best in class,” defined as the 25th percentile, representing the level of performance achieved by the best quarter of prescribers.
22For research projects, IRB/IEC approval is mandatory before commencement, and a protocol should document title, administrative details, summary, background, preliminary studies, objectives or questions, methodology, work plan or timeline, strengths and limitations, and ethical-review issues.
23The protocol should be followed strictly because poor preparation and poor adherence make it unlikely that the research will yield the expected information.
24During data collection and processing, poor methods create a “GIGO” effect; recommended processing steps include data editing or cleaning, pre-testing, coding, and verification of coded data.
25Datasets should be detailed enough to answer the question but not so detailed that collection becomes unsustainable, and resources should be provided both to collect and to analyze the data.
26The data collector should understand critical care fundamentals, and typographical errors should be prevented with error trapping and data validation.
27Audit meetings should follow a predefined timetable, be chaired, have defined aims, produce recommended practice changes, and then disseminate feedback before implementation.
28Evidence-based practice is described as recognizing a knowledge gap, formulating a specific question, searching for relevant evidence, and then forming a specific answer after reviewing that evidence.
29Use of evidence-based practices is described as helping caregivers provide high-quality care, improve processes, and reduce variation in care.
30For effective clinical improvement and patient outcomes, successful teams are described as having participatory leaders, effective transparent and timely decision-making, open communication, mutual trust, clear goals, defined roles, and strong coordinating relationships.
31Host organizations that support team-based improvement are described as aligning leadership support with strategic goals, using accepted change models, including consumers in design, and allocating resources to priority areas.
32High-value healthcare organizations are characterized by 4 habits: specify and plan in advance, deliberate design of infrastructure, measurement and oversight using predefined metrics and quality/safety goals, and self-study using measurements.
33Patient-safety implementation measures include incident reporting, root-cause analysis, and failure mode and effects analysis.
34Incident reporting should be voluntary, anonymous, and not linked to punitive measures.
35Root-cause analysis is described as a focused inquiry into selected important incidents in which a sentinel event is identified, preventive aspects are discussed by the safety team, and safeguards are implemented.
36Failure mode and effects analysis is described as prospectively examining an error-prone process using a multidisciplinary team before a sentinel event occurs.
37Strong leadership, primarily from the ICU director with supportive management, is described as necessary to initiate a safety and quality culture.
38Specific safety interventions include a daily goals sheet that increased understanding of ICU therapy goals from 10% to 95% and reduced average LOS from 2.2 to 1.1 days.
39A checklist for central venous catheter insertion aimed at reliable delivery of an evidence-based bundle was followed within 3 months by a fall in the CRBSI rate from 2.7 to 0 per 1000 catheter days (the means are printed as 8.7 and 2.3), whereas the baseline mean is given as 7.7 per 1000 catheter-days.